Sunday, December 21, 2014

And we're back...

I know it has been a while since my last post, and suffice it to say that the reason for that has been either a delay in work and/or interior wiring and plumbing work that is not of particular interest.  Also, I've been too busy with life and work to post.  Sorry.

Below are pictures of the first stage of drywall-ing.  We will take a break now to get some plumbing, electrical, security and HVAC items corrected and start back up after Jan 1.  I will post more this week on cabinetry, appliances and the master closet layout-- all of which are planned and sketched out.  We also made some lighting decisions with more to go.  Stay tuned.

Parlor (from great room).  Guest suite hall on right. 
Great Room Fireplace (awaiting design for the wall, mantle, shelving, etc.).

Great Room view and sliding glass doors to courtyard.

Front Door from great room (dining room on left, parlor on right).

Kitchen (refrigerator/freezer cabinet on right).

Kitchen (island will be where pipes are in floor - pantry is opening on left).

Dining room.

Kitchen and hallway to master bedroom, stairs, office, garage and utility room.

Office - doggie door to be added in right side corner for Caleb and Rhody.

Garage.

Hallway leading to master bedroom.  Mud area on left.

Hallway to master bedroom.  Lower cabinetry to be added on right side. 
Master bedroom.

Master Bedroom.

Master closet.

Master bathtub area.
Master shower (body jets, rain feature and shower head).

Hall to great room from master bedroom/garage.

Great Room.

Landing of stairs (halfway).

Second floor (guest rooms on left side (2) and loft area (game room) on right.

Loft area/game room.

First upstairs guest room (bathroom on left, closet not pictured).

Second upstairs guest room.  Closet on left, bathroom on right.

Balcony access from second upstairs guest room.

No comments: