Below are pictures of the first stage of drywall-ing. We will take a break now to get some plumbing, electrical, security and HVAC items corrected and start back up after Jan 1. I will post more this week on cabinetry, appliances and the master closet layout-- all of which are planned and sketched out. We also made some lighting decisions with more to go. Stay tuned.
Parlor (from great room). Guest suite hall on right. |
Great Room Fireplace (awaiting design for the wall, mantle, shelving, etc.). |
Great Room view and sliding glass doors to courtyard. |
Front Door from great room (dining room on left, parlor on right). |
Kitchen (refrigerator/freezer cabinet on right). |
Kitchen (island will be where pipes are in floor - pantry is opening on left). |
Dining room. |
Kitchen and hallway to master bedroom, stairs, office, garage and utility room. |
Office - doggie door to be added in right side corner for Caleb and Rhody. |
Garage. |
Hallway leading to master bedroom. Mud area on left. |
Hallway to master bedroom. Lower cabinetry to be added on right side. |
Master bedroom. |
Master Bedroom. |
Master closet. |
Master bathtub area. |
Master shower (body jets, rain feature and shower head). |
Hall to great room from master bedroom/garage. |
Great Room. |
Landing of stairs (halfway). |
Second floor (guest rooms on left side (2) and loft area (game room) on right. |
Loft area/game room. |
First upstairs guest room (bathroom on left, closet not pictured). |
Second upstairs guest room. Closet on left, bathroom on right. |
Balcony access from second upstairs guest room. |
No comments:
Post a Comment